AIPAMDTSUPsAICs

Published as of 09 JAN 2025

-Series: A
16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR
24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand
31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301
10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT
40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT
11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT
08/21 TEMPORARY WITHDRAWAL OF PATTANI (PT) NDB
04/23 GROUP OF TREE EXCEEDED HIGH THE OBSTACLE LIMITATION SURFACE
AT HAT YAI INTERNATIONAL AIRPORT (VTSS)
28/23 OBSTACLE TELECOMMUNICATION TOWER HIGHT 197 FT AGL IN AIR NAVIGATION
SAFETY ZONE OF MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
29/23 OBSTACLE RADIO TRANSMISSION MAST HIGHT 230 FT AGL IN AIR NAVIGATION
SAFETY ZONE OF MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
39/23 RAPID EXIT TAXIWAY INDICATOR LIGHTS OF RUNWAY 01L/19R ARE UNSERVICEABLE
AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
42/23 OBSTACLE EQUIPMENT (LLWAS) AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
01/24 TEMPORARY SUSPENSION OF PHUKET GP
12/24 TEMPORARY CONSTRUCTION WITH A GROUP OF TOWER CRANES ERECTED
IN THE VICINITY OF DON MUEANG INTERNATIONAL AIRPORT (VTBD)
16/24 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT DON MUEANG INTERNATIONAL AIRPORT (VTBD)
17/24 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
25/24 REVISED THE CONSTRUCTION OF RUNWAY STRIP AND TEMPORARY OBSTACLE
AT PHUKET INTERNATIONAL AIRPORT (VTSP)
28/24 FUELLING FACILITY AVIATION GASOLINE (AVGAS 100LL) IS TEMPORARILY NOT AVAILABLE
AT CHIANG MAI INTERNATIONAL AIRPORT (VTCC)
29/24 REVISED TEMPORARY SUSPENSION OF SURAT THANI DVOR/DME (STN) - (VTSB)
30/24 REVISED NEW TAXIWAYS CONSTRUCTION AND AIRFIELD LIGHTING SYSTEMS REVISION
AT KRABI AIRPORT (VTSG)
31/24 RADIO MAST HEIGHT PENETRATES OBSTACLE LIMITATION SURFACE
AT HAT YAI INTERNATIONAL AIRPORT
34/24 OPENING OF NEW APRON, AND TAXIWAY M AT SURAT THANI AIRPORT (VTSB)
36/24 REVISED THE OPENING OF APRON AT KRABI AIRPORT (VTSG)
39/24 REVISED THE CONSTRUCTION OF HYDRANT SYSTEM FOR AIRCRAFT FUELING STATION
AT KRABI AIRPORT (VTSG)
40/24 UNSERVICEABILITY OF APPROACH LIGHTS AND SEQUENCED FLASHING LIGHTS
OF RUNWAY 08 AND RUNWAY 26 AT HAT YAI INTERNATIONAL AIRPORT (VTSS)
44/24 REVISED IMPLEMENTATION OF DEPARTURE CLEARANCE (DCL) VIA DATA LINK
46/24 REVISED THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT (VTBS)
47/24 REVISED THE TEMPORARY FENCES INSTALLED ALONG TAXIWAY K AND TAXIWAY D11
AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
49/24 THE VISUAL DOCKING GUIDANCE SYSTEM (VDGS) OF AIRCRAFT STAND NUMBER 3 AND 4
AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT) IS UNSERVICEABLE
51/24 PHUKET INTERNATIONAL AIRPORT RUNWAY CLOSURE PROGRAM (VTSP)
(NOVEMBER 2024 - MARCH 2025)
53/24 THE RUNWAY VISUAL RANGE (RVR) OF RUNWAY 09 AND RUNWAY 27AT PHUKET AIRPORT (VTSP) IS UNAVAILABLE
54/24 REVISED TEMPORARY SUSPENSION OF SUVARNABHUMI DVOR/DME (SVB)
55/24 THE REMAINING OF NEW TAXIWAYS CONSTRUCTION AND OPENING OF NEW TAXIWAYSAT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
01/25 REVISED THE CLOSURE OF TAXIWAYS FOR TEMPORARY AIRCRAFT PARKINGAT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
02/25 TEMPORARY TOWER CRANE AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT (VTCC)
03/25 JOINT MILITARY AIR EXERCISE IN BANGKOK FIR "COBRA GOLD 2025"
04/25 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2025
05/25 JOINT MILITARY AIR EXERCISE IN BANGKOK FIR
" COMBAT SEARCH AND RESCUE (CSAR) AND CLOSE AIR SUPPORT (CAS) 2025 ”
-Series: B
10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT
15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND
05/21 TEMPORARY WITHDRAWAL OF NAN/NAN NAKHON ILS/DME AT NAN NAKHON AIRPORT
07/22 RELOCATION OF TAXIWAY C AND D SIGNS, AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT NAKHON SI THAMMARAT AIRPORT (VTSF)
06/24 REVISED TEMPORARY SUSPENSION OF TRANG GLIDE PATH (VTST)
13/24 THE TEMPORARY CRANES AT NEARBY NARATHIWAT AIRPORT (VTSC)
15/24 TEMPORARY SUSPENSION OF UBON RATCHATHANI GLIDE PATH (VTUU)
17/24 REVISED TEMPORARY SUSPENSION OF SUKHOTHAI ILS/DME (VTPO)
18/24 OPENING OF NEW APRON AND TAXIWAY A AND B, EXTENSION OF RUNWAY, TAXIWAY AND APRON,
CONSTRUCTION OF NEW ARFF STATION AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT BURIRAM AIRPORT (VTUO)
19/24 REVISION OF AIRFIELD LIGHTING SYSTEMS AT SAKON NAKHON AIRPORT (VTUI)
20/24 TEMPORARY CHANGE AERODROME OPERATIONAL HOUR SUKHOTHAI AIRPORT
21/24 REVISED RUNWAY AND TAXIWAY OVERLAY, CONSTRUCTION
OF TAXIWAY D, RUNWAY 03/21 TURN PAD AND RUNWAY END SAFETY AREA (RESA), AND
REVISION OF AIRFIELD LIGHTING SYSTEMS AT KHON KAEN AIRPORT (VTUK)
22/24 THE OPENING OF APRON AT KHON KAEN AIRPORT (VTUK)
23/24 INSTALLATION OF RUNWAY 20 TURN PAD LIGHTS AT NAN NAKHON AIRPORT (VTCN)
24/24 THE APPLICATION FOR AN AUTOMATED WEATHER OBSERVING SYSTEM (AWOS) LICENSE
AT LAMPANG AIRPORT (VTCL) IS IN PROGRESS
25/24 THE APPLICATION FOR AN AUTOMATED WEATHER OBSERVING SYSTEM (AWOS) LICENSE
AT MAESOT AIRPORT (VTPM) IS IN PROGRESS
26/24 THE AUTOMATED WEATHER OBSERVING SYSTEM (AWOS)
AT NARATHIWAT AIRPORT (VTSC) IS UNAVAILABLE
27/24 THE RUNWAY VISUAL RANGE (RVR) OF RUNWAY 08
AT TRANG AIRPORT (VTST) IS UNAVAILABLE
28/24 SERVICE REQUIREMENTS FOR PARALLEL TAXIWAYS AT PHITSANULOK AIRPORT (VTPP)
29/24 REQUEST FOR APPROVAL OF TEMPORARY CHANGE IN OPERATIONAL HOURSAT CHUMPHON AIRPORT (VTSE)
01/25 THE RUNWAY VISUAL RANGE (RVR) OF RUNWAY 02AT RANONG AIRPORT (VTSR) IS UNAVAILABLE
02/25 UNSERVICEABILITY OF SEQUENCED FLASHING LIGHTS OF RUNWAY 32
AT PHITSANULOK AIRPORT (VTPP)