Contact

Aeronautical Information Management Department
222 Soi Vibhavadi Rangsit 28,
Vibhavadi Rangsit Rd., Chatuchak,
Chatuchak, Bangkok 10900 Thailand

Tel: +662 568 8831

Fax: +662 576 1903

AFS: VTBAYOYX

E-mail: [email protected]

E-mail: [email protected]

AIP Supplement for Thailand

AIRAC AIP SUP

A 51/24

Effective from 31 OCT 2024

to 31 MAR 2025

Published on 19 SEP 2024

  PHUKET INTERNATIONAL AIRPORT RUNWAY CLOSURE PROGRAM (VTSP)
(NOVEMBER 2024 - MARCH 2025)

1  INTRODUCTION

This section supplements the following portion(s) of the AIP: AD

1  With effect from 31 October 2024 at 0100 UTC to 31 March 2025 at 0030 UTC, the purpose of this AIRAC AIP Supplement is to inform all concerned of the closure of runway 09/27 for the runway maintenance program at Phuket International Airport, to keep the runway in the optimal conditions and enhance the safety of flight operation.

2  PERIOD OF RUNWAY CLOSURE

2  Runway 09/27 will be closed on the date and time (UTC) as described in the attachment table. Period: November 2024 - March 2025.

3  PRECAUTIONS

3.1  All aircraft operators operating during these periods should plan to reschedule the flight operations in accordance with slot allocation.

3.2  Aircraft operators are advised to avoid using Phuket International Airport as an alternate aerodrome during the runway closure period.

3.3  Due to traffic congestion, departing and arriving aircrafts operating during this period will be delayed and aircraft operators should plan to carry sufficient contingency fuel.

3.4  All workers and construction equipment will be kept clear when Runway 09/27 is operational.

4  REVISIONS TO CLOSURE PROGRAM

4.1  The closure program may be revised in the event of forecast or actual adverse weather conditions or other extenuating circumstances.

4.2  Any revision to the closure program will be promulgated by NOTAM.

5  CONTACT

5  For further information contact via the following:

Unit: Aeronautical Information Services, Phuket International Airport.

Tel: + 667 635 1874

Fax: + 667 635 2347

E-mail: [email protected]

For more information concerning the slot clearance request contact via the following:

Unit: CAAT: Airport Slot Allocation Group (SAG)

E-mail: [email protected]

6  VALIDITY

6  This AIRAC AIP Supplement will remain current until 31 March 2025 at 0030 UTC. Any changes to this AIRAC AIP Supplement will be notified through NOTAM.