ContactAeronautical Information Management Department Tel: +662 568 8831 Fax: +662 576 1903 AFS: VTBAYOYX E-mail: [email protected] E-mail: [email protected] | AIP Supplement for Thailand | AIRAC AIP SUP B 19/24 Effective from 28 NOV 2024 to 31 MAR 2025 Published on 17 OCT 2024 |
This section supplements the following portion(s) of the AIP: AD
1 With effect from 28 November 2024 at 0101 UTC to 31 March 2025 at 2200 UTC, this AIRAC AIP Supplement is to inform all concerned of revision of airfield lighting systems at Sakon Nakhon Airport.
2.1 Revision works will be conducted on airfield lighting systems as follows:
Airfield Lighting Systems | Location |
---|---|
Runway lighting system Runway edge lights Runway threshold lights Runway end lights Runway turn pad lights Wing bar lights RTILs |
Runway 05/23 Runway 05/23 Runway 05/23 Runway 05/23 Runway 23 Runway 05 |
Taxiway lighting system Taxiway edge lights |
Taxiway A, B and C |
Approach lighting system | Runway 23 |
PAPI | Runway 05/23 |
Wind direction indicators | Runway 05/23 |
Apron floodlighting | Apron |
Signs | Taxiway A, B and C |
Constant Current Regulators (CCRs) | Airfield Lighting (AFL) Building |
AGL Control and Monitoring System | Airfield Lighting (AFL) Building / Aerodrome Control Tower |
2.2 The revision works will be performed daily between 0101 - 1000 UTC and 1300 - 2200 UTC except when flights are operated.
2.3 The chart related to the revision is attached herewith.
4 This AIRAC AIP Supplement will remain current until 31 March 2025 at 2200 UTC. Any changes to this AIRAC AIP Supplement will be notified through NOTAM.