AIPAMDTSUPsAICs

Published as of 04 APR 2024

-Series: A
4/11 IMPLEMENTATION OF RNP 10 OPERATIONS (50 NM LONGITUDINAL SEPARATION) ON ROUTE SEGMENTS JOINING ATS ROUTE P762 WITHIN BANGKOK FIR
7/11 IMPLEMENTATION OF PRE-DEPARTURE CLEARANCE (PDC) OVER DATA LINK
16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR
24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand
31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301
10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT
21/17 MODES OF OPERATION FOR SUVARNABHUMI INTERNATIONAL AIRPORT
40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT
11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT
31/20 ESTABLISHMENT OF NEW TAXIWAYS AND TAXILANES FOR TEMPORARY AIRCRAFT PARKING AT SUVARNABHUMI INTERNATIONAL AIRPORT
08/21 TEMPORARY WITHDRAWAL OF PATTANI (PT) NDB
04/23 GROUP OF TREE EXCEEDED HIGH THE OBSTACLE LIMITATION SURFACE
AT HAT YAI INTERNATIONAL AIRPORT (VTSS)
17/23 TEMPORARY SUSPENSION OF SURAT THANI DVOR/DME (STN) - (VTSB)
19/23 TEMPORARY CONSTRUCTION WITH TOWER CRANES ERECTED
IN THE VICINITY OF DON MUEANG INTERNATIONAL AIRPORT (VTBD)
25/23 THE VISUAL DOCKING GUIDANCE SYSTEM (VDGS) OF AIRCRAFT STAND NUMBER 3
AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT) IS UNSERVICEABLE
27/23 Opening of New Apron at Krabi Airport (VTSG)
28/23 OBSTACLE TELECOMMUNICATION TOWER HIGHT 197 FT AGL IN AIR NAVIGATION
SAFETY ZONE OF MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
29/23 OBSTACLE RADIO TRANSMISSION MAST HIGHT 230 FT AGL IN AIR NAVIGATION
SAFETY ZONE OF MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
33/23 TEMPORARY SUSPENSION OF SUVARNABHUMI DVOR/DME (SVB)
34/23 THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT (VTBS)
35/23 REVISED TEMPORARY INSTALLATION OF GROUND-BASED AUGMENTATION SYSTEM (GBAS)
PROOF OF CONCEPT EQUIPMENT AT SUVARNABHUMI INTERNATIONAL AIRPORT
36/23 REVISED THE TEMPORARY FENCES INSTALLED FOR CONSTRUCTION AREA AND THE REDUCTION OF RUNWAY STRIP 01L/19R DIMENSION AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
39/23 RAPID EXIT TAXIWAY INDICATOR LIGHTS OF RUNWAY 01L/19R ARE UNSERVICEABLE
AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
42/23 OBSTACLE EQUIPMENT (LLWAS) AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
49/23 REVISED TEMPORARY TOWER CRANE AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT (VTCC)
52/23 THE PARTIAL CLOSURE OF TAXIWAY E AND OPERATIONAL RESTRICTIONS OF RUNWAY 01L/19RAT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
53/23 PROVISION OF RUNWAY END SAFETY AREA (RESA) AT RUNWAY 14/32 AT KRABI AIRPORT (VTSG)
54/23 THE CONSTRUCTION OF HYDRANT SYSTEM FOR AIRCRAFT FUELING STATION
AT KRABI AIRPORT (VTSG)
01/24 TEMPORARY SUSPENSION OF PHUKET GP
02/24 THE CONSTRUCTION OF RUNWAY STRIP AND TEMPORARY OBSTACLE
AT PHUKET INTERNATIONAL AIRPORT
05/24 TEMPORARY SUSPENSION OF MAE FAH LUANG-CHIANG RAI ILS/DME
07/24 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2024
08/24 THE CLOSURE OF TAXIWAYS FOR TEMPORARY AIRCRAFT PARKING
AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
09/24 THE TEMPORARY FENCES INSTALLED ALONG TAXIWAY K AND TAXIWAY D11
AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
12/24 TEMPORARY CONSTRUCTION WITH A GROUP OF TOWER CRANES ERECTED
IN THE VICINITY OF DON MUEANG INTERNATIONAL AIRPORT (VTBD)
14/24 THE EXISTENCE OF TEMPORARY HANGAR AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
15/24 REVISED PHUKET INTERNATIONAL AIRPORT RUNWAY CLOSURE PROGRAM (VTSP)
16/24 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT DON MUEANG INTERNATIONAL AIRPORT (VTBD)
17/24 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
18/24 REVISED RUNWAY 04/22 OVERLAY, PARALLEL TAXIWAY CONSTRUCTIONAND AIRFIELD LIGHTING SYSTEM REVISION AT SURAT THANI AIRPORT (VTSB)
19/24 THE REMAINING OF NEW TAXIWAYS CONSTRUCTION AND OPENING OF NEW TAXIWAYS
AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
20/24 REVISED TEMPORARY CONSTRUCTION WITH TOWER CRANES
IN THE VICINITY OF DON MUEANG INTERNATIONAL AIRPORT (VTBD)
21/24 REVISED TEMPORARY SUSPENSION OF SURAT THANI GLIDE PATH (VTSB)
22/24 OPENING OF NEW TAXIWAYS (H AND J), EXTENSION OF RUNWAY 27 AND TAXIWAY P
AT PHUKET INTERNATIONAL AIRPORT (VTSP)
-Series: B
10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT
15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND
2/17 RE-ACTIVATE STANDARD INSTRUMENT DEPARTURE RUNWAY 20 OF RANONG AIRPORT
04/21 TEMPORARY WITHDRAWAL OF SUKHOTHAI DME (CH40X) AT SUKHOTHAI AIRPORT
05/21 TEMPORARY WITHDRAWAL OF NAN/NAN NAKHON ILS/DME AT NAN NAKHON AIRPORT
05/22 OPENING OF NEW APRON AT KRABI AIRPORT (VTSG)
07/22 RELOCATION OF TAXIWAY C AND D SIGNS, AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT NAKHON SI THAMMARAT AIRPORT (VTSF)
02/23 THE CONSTRUCTION OF RUNWAY WIDTH EXTENSION, OVERLAY OF RUNWAY 18/36 AND AIRFIELD LIGHTING SYSTEM AT LAMPANG AIRPORT (VTCL)
12/23 THE APPLICATION FOR AN AUTOMATED WEATHER OBSERVING SYSTEM (AWOS) LICENSE
AT LAMPANG AIRPORT IS IN PROGRESS
15/23 THE APPLICATION FOR AN AUTOMATED WEATHER OBSERVING SYSTEM (AWOS) LICENSE
AT MAESOT AIRPORT IS IN PROGRESS
16/23 TEMPORARY SUSPENSION OF ILS/DME BURIRAM (IBRM)
17/23 REVISION OF AIRFIELD LIGHTING SYSTEMS AT NARATHIWAT AIRPORT (VTSC)
19/23 UNSERVICEABILITY OF SEQUENCED FLASHING LIGHTS OF RUNWAY 32
AT PHITSANULOK AIRPORT (VTPP)
21/23 INSTALLATION OF RUNWAY 09/27 TURN PAD LIGHTS AT MAE SOT AIRPORT (VTPM)
22/23 INSTALLATION OF RUNWAY 25 TURN PAD LIGHTS AT BETONG AIRPORT (VTSY)
23/23 INSTALLATION OF RUNWAY 01 TURN PAD LIGHTS AT LOEI AIRPORT (VTUL)
25/23 APRON EXTENSION, RUNWAY AND TAXIWAY OVERLAY,CONSTRUCTION OF TAXIWAY D, RUNWAY 03/21 TURN PAD AND RESA,AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT KHON KAEN AIRPORT (VTUK)
26/23 OPENING OF NEW APRON AND TAXIWAY B, EXTENSION OF RUNWAY, TAXIWAY AND APRON,
CONSTRUCTION OF NEW ARFF STATION AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT BURIRAM AIRPORT (VTUO)
27/23 INSTALLATION OF RUNWAY 05/23 TURN PAD LIGHTS AT UBON RATCHATANI AIRPORT (VTUU)
28/23 INSTALLATION OF RUNWAY 06/24 TURN PAD LIGHTS AT CHUMPHON AIRPORT (VTSE)
29/23 REVISION OF AIRFIELD LIGHTING SYSTEMS AT SAKON NAKHON AIRPORT
02/24 RUNWAY WIDTH EXTENSION CONSTRUCTION, OVERLAY OF RUNWAY 16/34 AND TAXIWAYS PAVEMENT AND AIRFIELD LIGHTING SYSTEMS REVISION AT HUA HIN AIRPORT (VTPH)
04/24 TEMPORARY CHANGE AERODROME OPERATIONAL HOUR SUKHOTHAI AIRPORT
06/24 REVISED TEMPORARY SUSPENSION OF TRANG GLIDE PATH (VTST)