AIPAMDTSUPsAICs

Published as of 17 NOV 2022

-Series: A
7/01 ESTABLISHMENT OF STANDARD INSTRUMENT DEPARTURE (SIDs) AT TRANG AIRPORT
4/11 IMPLEMENTATION OF RNP 10 OPERATIONS (50 NM LONGITUDINAL SEPARATION) ON ROUTE SEGMENTS JOINING ATS ROUTE P762 WITHIN BANGKOK FIR
7/11 IMPLEMENTATION OF PRE-DEPARTURE CLEARANCE (PDC) OVER DATA LINK
16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR
14/14 ESTABLISHMENT OF THE TEMPORARY ENGINE RUN-UP AREA, THE TEMPORARY ISOLATED AIRCRAFT PARKING AREAS AND THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT
24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand
31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301
10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT
21/17 MODES OF OPERATION FOR SUVARNABHUMI INTERNATIONAL AIRPORT
40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT
11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT
26/20 TEMPORARY TOWER CRANES AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT
31/20 ESTABLISHMENT OF NEW TAXIWAYS AND TAXILANES FOR TEMPORARY AIRCRAFT PARKING AT SUVARNABHUMI INTERNATIONAL AIRPORT
07/21 TEMPORARY FENCES INSTALLED FOR CONSTRUCTION AREA AND THE REDUCTION OF RUNWAY STRIP 01L/19R DIMENSION AT SUVARNABHUMI INTERNATIONAL AIRPORT
08/21 TEMPORARY WITHDRAWAL OF PATTANI (PT) NDB
10/21 THE CONSTRUCTION OF NEW TAXIWAYS AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
14/21 THE CLOSURE OF TAXIWAY AT SUVARNABHUMI INTERNATIONAL AIRPORT
21/21 THE CONSTRUCTION OF TAXIWAY D EXTENSION AND OPERATIONAL RESTRICTIONS OF TAXIWAY E AND RUNWAY 01L/19R AT SUVARNABHUMI INTERNATIONAL AIRPORT
02/22 OPENING OF NEW PRIVATE JET TERMINAL, APRON, AIRCRAFT PARKING STANDS, HANGAR AND TAXIWAY AT PHUKET INTERNATIONAL AIRPORT (VTSP)
04/22 TEMPORARY TOWER CRANE AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT (VTCC)
05/22 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2022
10/22 TEMPORARY INSTALLATION OF GROUND-BASED AUGMENTATION SYSTEM (GBAS) PROOF OF CONCEPT EQUIPMENT AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
11/22 REVISED THE CONSTRUCTION OF NEW TAXIWAYS AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
15/22 REVISED THE CONSTRUCTION OF NEW TAXIWAYS
AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
17/22 THE VISUAL DOCKING GUIDANCE SYSTEM (VDGS) UPGRADING AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
18/22 THE NEW ADVANCED VISUAL DOCKING GUIDANCE SYSTEM (A-VDGS) AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
19/22 REVISED THE CONSTRUCTION OF TAXIWAY D EXTENSIONAND OPERATIONAL RESTRICTIONS OF TAXIWAY E AND RUNWAY 01L/19RAT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
20/22 AIR DISPLAY FOR 2023 IN CELEBRATION OF NATIONAL CHILDREN’S DAYAT DON MUEANG INTERNATIONAL AIRPORT (VTBD)
21/22 AIR DISPLAY FOR 2023 IN CELEBRATION OF NATIONAL CHILDREN'S DAY
AT CHIANG MAI INTERNATIONAL AIRPORT (VTCC)
22/22 RUNWAY WIDTH EXTENSION CONSTRUCTION, OVERLAY OF RUNWAY 16/34 AND TAXIWAYS PAVEMENT AND AIRFIELD LIGHTING SYSTEMS REVISION AT HUA HIN AIRPORT (VTPH)
23/22 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
24/22 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT DON MUEANG INTERNATIONAL AIRPORT (VTBD)
25/22 THE CONSTRUCTION OF RUNWAY END SAFETY AREA (RESA) RUNWAY 08 AND 26 , BLAST PAD
AND SERVICE ROAD AT HAT YAI INTERNATIONAL AIRPORT (VTSS)
-Series: B
8/00 ESTABLISHMENT OF NEW INSTRUMENT APPROACH PROCEDURES AT PHRAE AIRPORT
10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT
15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND
2/17 RE-ACTIVATE STANDARD INSTRUMENT DEPARTURE RUNWAY 20 OF RANONG AIRPORT
04/21 TEMPORARY WITHDRAWAL OF SUKHOTHAI DME (CH40X) AT SUKHOTHAI AIRPORT
05/21 TEMPORARY WITHDRAWAL OF NAN/NAN NAKHON ILS/DME AT NAN NAKHON AIRPORT
08/21 THE EXPANSION OF APRON, REVISION OF AIRFIELD LIGHTING SYSTEMS, INSTALLATION OF AEROBRIDGE AND VISUAL DOCKING GUIDANCE SYSTEM AT SURAT THANI AIRPORT
01/22 RUNWAY EXTENSION, RUNWAY OVERLAY, CONSTRUCTION OF RUNWAY 08/26 RESA AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT TRANG AIRPORT
02/22 RUNWAY AND TAXIWAY EXTENSION, APRON EXPANSION, CARGO TERMINAL CONSTRUCTION AND AIRFIELD LIGHTING SYSTEM REVISION AT BURIRAM AIRPORT
04/22 APRON EXTENSION, RUNWAY AND TAXIWAY OVERLAY, CONSTRUCTION OF TAXIWAY D, RUNWAY 03/21 TURN PAD AND RESA,AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT KHON KAEN AIRPORT
05/22 OPENING OF NEW APRON AT KRABI AIRPORT (VTSG)
07/22 RELOCATION OF TAXIWAY C AND D SIGNS, AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT NAKHON SI THAMMARAT AIRPORT (VTSF)
08/22 OVERLAY OF RUNWAY AND TAXIWAY PAVEMENTS AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT NAKHON SI THAMMARAT AIRPORT
10/22 OPENING OF NEW APRON AND NEW TAXIWAY M AND CLOSURE OF EXISTING APRON AND TAXIWAYS (A AND B) AT SURAT THANI AIRPORT
11/22 CONCRETE REVISION OF EXISTING APRON A (EAST) AT SAKON NAKHON AIRPORT (VTUI)
13/22 NEW TAXIWAYS CONSTRUCTION AND AIRFIELD LIGHTING SYSTEMS REVISION
AT KRABI AIRPORT (VTSG)
15/22 CONSTRUTION OF RUNWAY 06/24 TURN PADS AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT CHUMPHON AIRPORT (VTSE)
16/22 APRON EXTENSION, RUNWAY AND TAXIWAY OVERLAY, CONSTRUCTION OF TAXIWAY D,
RUNWAY 03/21 TURN PAD AND RESA, AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT KHON KAEN AIRPORT (VTUK)