Contact

The Civil Aviation Authority of Thailand
Aeronautical Information Service Department
333/105 Lak Si Plaza, Khamphaeng Phet 6 Rd.
Talat Bang Khen, Lak Si, Bangkok 10210, Thailand

Tel: +662 568 8831

Fax: +662 576 1903

AFS: VTBAYOYX

E-mail: aisthai@caat.or.th

E-mail: ais@caat.or.th

AIP Supplement for Thailand

AIP SUP

B 01/22

Effective from 08 APR 2022

to 30 OCT 2025

Published on 07 APR 2022

  RUNWAY EXTENSION, RUNWAY OVERLAY, CONSTRUCTION OF RUNWAY 08/26 RESA AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT TRANG AIRPORT

1  INTRODUCTION

This section supplements the following portion(s) of the AIP: AD

1  With effect from 8 April 2022 at 0100 UTC to 30 October 2025 at 2200 UTC, this AIP Supplement is to inform all concerned of runway extension, runway overlay, construction of runway 08/26 RESA and revision of airfield lighting systems at Trang Airport. The details are as follows:

2  CONSTRUCTION DETAILS

2.1  The construction works include runway extension, runway overlay, construction of runway 08/26 RESA and revision of airfield lighting systems.

2.2  The construction will be conducted in the sites below:

  1. Location 1 (07° 30' 38" N 099° 36' 31" E)

  1. Location 2 (07° 30' 22" N 099° 36' 32" E)

  1. Location 3 (07° 30' 18" N 099° 36' 07" E)

  1. Location 4 (07° 30' 36" N 099° 36' 13" E)

Western area 578 meters away from the threshold of RWY 08

2.3  All workers and equipment must not be over 33 feet above ground level and must vacate runway strip within 15 minutes to accommodate flight operations (take-off and landing).

2.4  The approach lighting at runway 08 will be removed and therefore become unserviceable.

2.5  The construction works will be performed daily from 0100 UTC to 1000 UTC and from 1300 UTC to 2200 UTC except when scheduled flights are operated.

2.6   Flashing red lights (unserviceability lights) will be displayed 0.5 metres above ground level at intervals of 3 metres to mark construction site. Vehicles and machinery in the site are all marked by 90 x 90 cm orange and white checkered flags. Personnel in the site are required to wear a reflective safety vest to meet safety requirements.

2.7  The charts related to the construction are attached herewith.

3  CONTACT

3.1  Mrs. Jutharat Petch-Lu
Tel: +668 4899 8668
E-mail: annis_ka@hotmail.com

3.2  Mr.Uthai Damthip
Tel: +668 9728 5956
E-mail: puvadaddamthip@gmail.com

3.3  Ms. Suppamas Phonchanigo
Tel: +668 4509 6328
E-mail: suppamas6328@gmail.com

3.4  Mrs. Kanlaya Khangkhan
Tel: +668 2280 1868
E-mail: Kanlaya8369@gmail.com

4  VALIDITY

4  This AIP Supplement superseded NOTAM C0672/22 and will remain current until 30 October 2025 at 2200 UTC. Any changes to this AIP Supplement will be notified through NOTAM.