ContactThe Civil Aviation Authority of Thailand Tel: +662 568 8831 Fax: +662 576 1903 AFS: VTBAYOYX E-mail: aisthai@caat.or.th E-mail: ais@caat.or.th | AIP Supplement for Thailand | AIP SUP B 13/22 Effective from 26 AUG 2022 to 16 APR 2023 Published on 25 AUG 2022 |
This section supplements the following portion(s) of the AIP: AD
1 With effect from 26 August 2022 at 0100 UTC to 16 April 2023 at 1400 UTC, this AIP Supplement is to inform all concerned of new taxiways construction and airfield lighting systems revision at Krabi Airport. The details are as follows:
2.1 The construction works at Krabi Airport include construction of new taxiways and revision of airfield lighting systems.
2.2 The construction of Taxiway P will be conducted 110 metres away from the runway centerline and cover the length of 2,010 metres in total starting from the threshold of Runway 32.
2.3 The construction of rapid Taxiway G will be conducted 622 metres away from the threshold of Runway 32, 22.5 metres away from the runway centerline and cover the width of 243.7 metres.
2.4 The construction of Taxiway H will be conducted 84.5 metres away from the runway centerline starting from the threshold of runway 32 and cover the width of 50 metres.
2.5 The construction works will be performed daily between 0100 - 1400 UTC except when scheduled flights are operated.
2.6 The construction areas will be denoted by highly visible orange barriers and unserviceable lights displayed 0.5 metres above ground level at intervals of 3 metres. All vehicles and machinery in the site will be equipped with 90 x 90 cm orange and white checkered flags or flashing yellow lights. All Personnel in the site are required to wear a reflective safety vest to meet safety requirements.
2.7 The charts related to the construction and revision are attached herewith.
3.1 Mr.Thitawat Chittchang
Tel: +668 9645 6024
E-mail: ch.thitawat@gmail.com
3.2 Ms.Hassamon Yodkraisri
Tel. +666 3629 7955
E-mail: nest.hassamon@gmail.com
4 This AIP Supplement superseded NOTAM C2719/22 and C2679/22 and will remain current until 16 April 2023 at 1400 UTC. Any changes to this AIP Supplement will be notified through NOTAM.