Published as of 24 SEP 2020
7/01 ESTABLISHMENT OF STANDARD INSTRUMENT DEPARTURE (SIDs) AT TRANG AIRPORT 4/11 IMPLEMENTATION OF RNP 10 OPERATIONS (50 NM LONGITUDINAL SEPARATION) ON ROUTE SEGMENTS JOINING ATS ROUTE P762 WITHIN BANGKOK FIR 7/11 IMPLEMENTATION OF PRE-DEPARTURE CLEARANCE (PDC) OVER DATA LINK 16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR 14/14 ESTABLISHMENT OF THE TEMPORARY ENGINE RUN-UP AREA, THE TEMPORARY ISOLATED AIRCRAFT PARKING AREAS AND THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT 24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand 31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301 10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT 16/17 RADIO COMMUNICATION FAILURE PROCEDURE 17/17 FLIGHT PROCEDURE AT DON MUEANG INTERNATIONAL AIRPORT 18/17 FLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT 19/17 AIRCRAFT TRANSPONDER FAILURE PROCEDURES IN BANGKOK FIR 21/17 MODES OF OPERATION FOR SUVARNABHUMI INTERNATIONAL AIRPORT 22/17 SPEED CONTROL AND ALTITUDE RESTRICTIONS PROMULGATION IN BANGKOK FIRT 23/17 REVISE FUEL DUMPING PROCEDURE AND IN-FLIGHT FUEL MANAGEMENT PROCEDURES 33/17 IMPLEMENTATION OF UNI-DIRECTIONAL OPERATING PROCEDURES FOR FLIGHTS OPERATING ON ATS ROUTE R468 AND A340 40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT 11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT 30/19 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2020 5/20 THE UPPER-AIR SOUNDING IN BANGKOK FIR 2020 19/20 THE CLOSURE OF AIRCRAFT STAND PIER 3, 4 AND NORTH CORRIDOR AT DON MUEANG INTERNATIONAL AIRPORT 21/20 AIRSPACE MANAGEMENT AND OPERATING PROCEDURES FOR AIRSPACE MANAGEMENT CELL (THAILAND) 23/20 THE CLOSURE OF TAXIWAY D AND TAXIWAY C AT DON MUEANG INTERNATIONAL AIRPORT 24/20 REVISED AERIAL LASER TOPOGRAPHY SURVEY BY ROYAL THAI SURVEY DEPARTMENT 25/20 OPERATING PROCEDURE FOR Y99 FLIGHT EFFICIENCY ENHANCEMENT 26/20 TEMPORARY TOWER CRANES AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT 8/00 ESTABLISHMENT OF NEW INSTRUMENT APPROACH PROCEDURES AT PHRAE AIRPORT 10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT 15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND 2/17 RE-ACTIVATE STANDARD INSTRUMENT DEPARTURE RUNWAY 20 OF RANONG AIRPORT 4/20 REVISION OF AIRFIELD LIGHTING SYSTEMS AT NAN NAKHON AIRPORT 5/20 THE OVERLAY OF RUNWAY 15/33 AND TAXIWAYS PAVEMENT AND REVISION OF RUNWAY AND TAXIWAY LIGHTING SYSTEMS AT NAKHON PHANOM AIRPORT 10/20 THE OVERLAY OF RUNWAY 02/20, TAXIWAYS PAVEMENT AND REVISION OF RELEVANT LIGHTING SYSTEM AT NAN NAKHON AIRPORT 11/20 THE OVERLAY OF RUNWAY 04/22, TAXIWAY A PAVEMENT AND REVISION OF RELEVANT LIGHTING SYSTEM AT BURI RAM AIRPORT 12/20 THE OVERLAY OF RUNWAY 02/20, TAXIWAYS PAVEMENT AND REVISION OF RELEVANT LIGHTING SYSTEM AT NARATHIWAT AIRPORT 6/20 THE OVERLAY OF RUNWAY 18/36, TAXIWAYS PAVEMENT, REVISION OF RELEVANT LIGHTING SYSTEM AND CONSTRUCTION OF RUNWAY 18/36 TURN PAD AT PHETCHABUN AIRPORT 7/20 REVISED THE CONSTRUCTION OF TAXIWAY C AND INSTALLATION OF LIGHTING SYSTEM AT KRABI AIRPORT 8/20 THE OVERLAY OF RUNWAY 11/29, TAXIWAYS PAVEMENT, REVISION OF RELEVANT LIGHTING SYSTEM AND CONSTRUCTION OF RUNWAY 11/29 TURN PAD AT MAE HONG SON AIRPORT 9/20 THE OVERLAY OF RUNWAY 02/20, TAXIWAYS PAVEMENT AND REVISION OF RELEVANT LIGHTING SYSTEM AT RANONG AIRPORT