Published as of 07 APR 2022
7/01 ESTABLISHMENT OF STANDARD INSTRUMENT DEPARTURE (SIDs) AT TRANG AIRPORT
4/11 IMPLEMENTATION OF RNP 10 OPERATIONS (50 NM LONGITUDINAL SEPARATION) ON ROUTE SEGMENTS JOINING ATS ROUTE P762 WITHIN BANGKOK FIR
7/11 IMPLEMENTATION OF PRE-DEPARTURE CLEARANCE (PDC) OVER DATA LINK
16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR
14/14 ESTABLISHMENT OF THE TEMPORARY ENGINE RUN-UP AREA, THE TEMPORARY ISOLATED AIRCRAFT PARKING AREAS AND THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT
24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand
31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301
10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT
21/17 MODES OF OPERATION FOR SUVARNABHUMI INTERNATIONAL AIRPORT
40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT
11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT
26/20 TEMPORARY TOWER CRANES AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT
31/20 ESTABLISHMENT OF NEW TAXIWAYS AND TAXILANES FOR TEMPORARY AIRCRAFT PARKING AT SUVARNABHUMI INTERNATIONAL AIRPORT
07/21 TEMPORARY FENCES INSTALLED FOR CONSTRUCTION AREA AND THE REDUCTION OF RUNWAY STRIP 01L/19R DIMENSION AT SUVARNABHUMI INTERNATIONAL AIRPORT
08/21 TEMPORARY WITHDRAWAL OF PATTANI (PT) NDB
10/21 THE CONSTRUCTION OF NEW TAXIWAYS AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
14/21 THE CLOSURE OF TAXIWAY AT SUVARNABHUMI INTERNATIONAL AIRPORT
15/21 GROUP OF TREES EXCEEDED HIGHT THE OBSTACLE LIMITATION SURFACE AT HAT YAI INTERNATIONAL AIRPORT
16/21 PHUKET INTERNATIONAL AIRPORT RUNWAY CLOSURE PROGRAM
19/21 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT DON MUEANG INTERNATIONAL AIRPORT
20/21 REVISED IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SUVARNABHUMI INTERNATIONAL AIRPORT
21/21 THE CONSTRUCTION OF TAXIWAY D EXTENSION AND OPERATIONAL RESTRICTIONS OF TAXIWAY E AND RUNWAY 01L/19R AT SUVARNABHUMI INTERNATIONAL AIRPORT
02/22 OPENING OF NEW PRIVATE JET TERMINAL, APRON, AIRCRAFT PARKING STANDS, HANGAR AND TAXIWAY AT PHUKET INTERNATIONAL AIRPORT (VTSP)
04/22 TEMPORARY TOWER CRANE AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT (VTCC)
05/22 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2022
07/22 RUNWAY PREVENTIVE MAINTENANCE PROGRAM AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
10/22 TEMPORARY INSTALLATION OF GROUND-BASED AUGMENTATION SYSTEM (GBAS) PROOF OF CONCEPT EQUIPMENT AT SUVARNABHUMI INTERNATIONAL AIRPORT (VTBS)
11/22 REVISED THE CONSTRUCTION OF NEW TAXIWAYS AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT (VTCT)
12/22 REVISED TEMPORARY WITHDRAWAL OF TRAT NDB/DME (TRT)
8/00 ESTABLISHMENT OF NEW INSTRUMENT APPROACH PROCEDURES AT PHRAE AIRPORT
10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT
15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND
2/17 RE-ACTIVATE STANDARD INSTRUMENT DEPARTURE RUNWAY 20 OF RANONG AIRPORT
16/20 THE CONSTRUCTION OF RUNWAY WIDTH EXTENSION, OVERLAY OF RUNWAY 16/34, TAXIWAYS PAVEMENT AND REVISION OF RELEVANT LIGHTING SYSTEM AT HUA HIN AIRPORT
04/21 TEMPORARY WITHDRAWAL OF SUKHOTHAI DME (CH40X) AT SUKHOTHAI AIRPORT
05/21 TEMPORARY WITHDRAWAL OF NAN/NAN NAKHON ILS/DME AT NAN NAKHON AIRPORT
08/21 THE EXPANSION OF APRON, REVISION OF AIRFIELD LIGHTING SYSTEMS, INSTALLATION OF AEROBRIDGE AND VISUAL DOCKING GUIDANCE SYSTEM AT SURAT THANI AIRPORT
09/21 REVISED THE CONSTRUCTION OF RUNWAY WIDTH EXTENSION, OVERLAY OF RUNWAY 18/36 AND AIRFIELD LIGHTING SYSTEM AT LAMPANG AIRPORT
01/22 RUNWAY EXTENSION, RUNWAY OVERLAY, CONSTRUCTION OF RUNWAY 08/26 RESA AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT TRANG AIRPORT