AIPAMDTSUPsAICs

Published as of 16 JAN 2020

-Series: A
7/01 ESTABLISHMENT OF STANDARD INSTRUMENT DEPARTURE (SIDs) AT TRANG AIRPORT
4/11 IMPLEMENTATION OF RNP 10 OPERATIONS (50 NM LONGITUDINAL SEPARATION) ON ROUTE SEGMENTS JOINING ATS ROUTE P762 WITHIN BANGKOK FIR
7/11 IMPLEMENTATION OF PRE-DEPARTURE CLEARANCE (PDC) OVER DATA LINK
16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR
14/14 ESTABLISHMENT OF THE TEMPORARY ENGINE RUN-UP AREA, THE TEMPORARY ISOLATED AIRCRAFT PARKING AREAS AND THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT
24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand
31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301
10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT
16/17 RADIO COMMUNICATION FAILURE PROCEDURE
17/17 FLIGHT PROCEDURE AT DON MUEANG INTERNATIONAL AIRPORT
18/17 FLIGHT PROCEDURE AT SUVARNABHUMI INTERNATIONAL AIRPORT
19/17 AIRCRAFT TRANSPONDER FAILURE PROCEDURES IN BANGKOK FIR
21/17 MODES OF OPERATION FOR SUVARNABHUMI INTERNATIONAL AIRPORT
22/17 SPEED CONTROL AND ALTITUDE RESTRICTIONS PROMULGATION IN BANGKOK FIRT
23/17 REVISE FUEL DUMPING PROCEDURE AND IN-FLIGHT FUEL MANAGEMENT PROCEDURES
33/17 IMPLEMENTATION OF UNI-DIRECTIONAL OPERATING PROCEDURES FOR FLIGHTS OPERATING ON ATS ROUTE R468 AND A340
40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT
11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT
23/19 REVISED INSTALLATION OF AUTOMATED WEATHER OBSERVING SYSTEM (AWOS) AND LOW LEVEL WIND SHEAR ALERT SYSTEM (LLWAS) AT CHIANG MAI INTERNATIONAL AIRPORT
24/19 OPENING OF AIRCRAFT PARKING STANDS NUMBER 6 AND 7 FROM SUNRISE TO SUNSET AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
26/19 THE CLOSURE OF RUNWAY 01R/19L AND TAXIWAYS AT SUVARNABHUMI INTERNATIONAL AIRPORT
30/19 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2020
32/19 REVISED PHUKET INTERNATIONAL AIRPORT RUNWAY MAINTENANCE PROGRAM
33/19 THE CONSTRUCTION OF NEW TAXIWAY AND AIRCRAFT PARKING POSITION AT HAT YAI INTERNATIONAL AIRPORT
2/20 IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT DON MUEANG INTERNATIONAL AIRPORT
3/20 IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SUVARNABHUMI INTERNATIONAL AIRPORT
4/20 AERIAL LASER TOPOGRAPHY SURVEY BY ROYAL THAI SURVEY DEPARTMENT
5/20 THE UPPER-AIR SOUNDING IN BANGKOK FIR 2020
6/20 THE CONSTRUCTION OF NEW TAXIWAY CONNECTING TO NEW PRIVATE JET TERMINAL AT PHUKET INTERNATIONAL AIRPORT
7/20 REVISED TEMPORARY WITHDRAWAL OF UBON DVOR/DME AT UBON RATCHATHANI AIRPORT
8/20 TEMPORARY WITHDRAWAL OF CHIANG RAI DVOR/DME AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
9/20 TEMPORARY WITHDRAWAL OF RAYONG DVOR/DME
11/20 REVISED JOINT MILITARY AIR EXERCISE IN BANGKOK FIR "COBRA GOLD 2020"
12/20 REVISED JOINT MILITARY AIR EXERCISE IN BANGKOK FIR "COPE TIGER 2020"
-Series: B
8/00 ESTABLISHMENT OF NEW INSTRUMENT APPROACH PROCEDURES AT PHRAE AIRPORT
10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT
13/03 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURES AT ROIET AIRPORT
15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND
2/17 RE-ACTIVATE STANDARD INSTRUMENT DEPARTURE RUNWAY 20 OF RANONG AIRPORT
1/20 REVISED THE CONSTRUCTION OF TAXIWAY C AND INSTALLATION OF LIGHTING SYSTEM AT KRABI AIRPORT
2/20 REVISION OF CONCRETE ON TAXIWAY AT UDON THANI AIRPORT