Contact

Aeronautical Information Management Department
222 Soi Vibhavadi Rangsit 28,
Vibhavadi Rangsit Rd., Chatuchak,
Chatuchak, Bangkok 10900 Thailand

Tel: +662 568 8831

Fax: +662 576 1903

AFS: VTBAYOYX

Email: [email protected]

Email: [email protected]

AIP Supplement for Thailand

AIRAC AIP SUP

B 16/26

Effective from 09 JUL 2026

to 31 JUL 2027

Published on 28 MAY 2026

  RUNWAY 01/19, TAXIWAY A, B AND C, APRON EXTENSION,RUNWAY STRIP AND TAXIWAY C CLEARWAY CONSTRUCTION,AND AIRFIELD LIGHTING SYSTEM REVISION AT NAKHON SI THAMMARAT AIRPORT (VTSF)

1  INTRODUCTION

With effect from 9 July 2026 at 1500 UTC until 31 July 2027 at 2200 UTC, this AIRAC AIP Supplement is issued to notify all concerned that construction works on Runway 01/19, Taxiways A, B and C, apron extension, runway strip, Taxiway C clearway, and airfield lighting system revision will be carried out at Nakhon Si Thammarat Airport (VTSF).

2   DETAILS

2.1 The construction project for Runway, taxiway and apron extension and airfield lighting system revision at Nakhon Si Thammarat Airport (VTSF) consists of the following works:
No.ActivityPeriodHours of Operation (UTC)CoordinatesRemarks
1Runway 01/19 and
Taxiways A and B
overlay
28 May 2026
-
30 Sep 2026
The affected areas
will be closed after
the last flight until 2200 UTC due to
the above works.
--
2RWY 01/19 turn pad area construction
3Runway strip upgrading1 Aug 2026
-
31 Jul 2027
See the attached
chart for details.
4Airfield lighting system revision 28 May 2026
-
30 Sep 2026
-Runway 01/19-Taxiway A -Taxiway B
1 Apr 2026
-
30 Jun 2027
0100 - 1000
and
The affected areas
will be closed after
the last flight until
2200 UTC due to
the above works.
-Taxiway C -Apron B
5Taxiway C construction 28 May 2026
-
30 Jun 2027
See the attached chart for details.Taxiway C close H24
6Apron extension works in Zone A
and Zone B, and
construction of
the Airfield Lighting
(AFL) building
1 Apr 2026
-
30 Jun 2027
0100 - 1000
and
The affected areas
will be closed after
the last flight until
2200 UTC due to
the above works.
Zone AA1 08 32 18.17N
099 56 29.74EA2 08 32 15.24N
099 56 29.40EA3 08 32 17.79N
099 56 31.86EA4 08 32 14.79N
099 56 31.86E
Zone BB1 08 32 13.15N
099 56 26.60EB2 08 32 09.10N
099 56 25.13EB3 08 32 08.42N
099 56 30.65EB4 08 32 12.54N
099 56 32.24E
-
7Site preparation works
for Taxiway C strip
1 Jun 2026
-
31 Jul 2027
The affected areas
will be closed after
the last flight until
2200 UTC due to
the above works.
See the attached chart for details.All works
shall be suspended
during aircraft
movements.
8Removal of
the existing pavement and construction
of a new service road
1 Jan 2027
-
31 Mar 2027
See the attached chart for detailsAll machinery
shall be removed from the work area
after working hours.
9Drainage works
for the glide path
1 Jan 2027
-
31 May 2027
0100 - 1000
and
The affected areas
will be closed after
the last flight until
2200 UTC due to
the above works.
All works shall be
suspended during
aircraft movements.
Taxiways A and B, and aircraft stands 1-7, are available for normal operations.
Operators of private aircraft and training flights shall coordinate with the airport authority prior to filing a flight plan.
2.2 All machinery and personnel shall vacate the work area and maintain a safe distance at least 15 minutes prior to any aircraft take-off or landing.
2.3 The construction area shall be demarcated by barriers painted in alternating red and white or orange and white colours for warning purposes.
2.4 Vehicles and machinery operating in the airside will be equipped with 90 x 90 cm. orange and white checkered flags or flashing lights.
2.5 Personnel in the worksites are required to wear a reflective safety vest and a safety helmet.
2.6 The charts related to the construction and revision works are attached herewith.

3  CONTACTS

3.1 Mr. Maysa Luanunkarb

Tel: +668 1451 6140

Email: [email protected]

3.2 Ms. Sitthiporn khangkhan

Tel: +668 1590 4101

Email: [email protected]

4   VALIDITY

This AIRAC AIP Supplement supersedes AIRAC AIP Supplement B11/26 dated 5 Mar 2026 and will remain in effect until 31 Jul 2027 at 2200 UTC. Operational restrictions during the construction period will be promulgated by NOTAM.