AIP Supplement for Thailand

AIRAC AIP SUP

B 04/26

Effective from 22 JAN 2026

to 13 OCT 2026

Published on 11 DEC 2025

  RUNWAY EXTENSION, RUNWAY OVERLAY, CONSTRUCTION OF RUNWAY 08/26 RESA
AND REVISION OF AIRFIELD LIGHTING SYSTEMS AT TRANG AIRPORT (VTST)

1  INTRODUCTION

With effect from 22 January 2026 at 0100 UTC to 13 October 2026 at 2200 UTC, this AIRAC AIP Supplement is to inform all concerned of runway extension, runway overlay, construction of runway 08/26 RESA and revision of airfield lighting systems at Trang Airport. The details are as follows:

2  DETAILS AND CLOSER PERIOD

2.1 The construction works include runway extension, runway overlay, construction of runway 08/26 RESA and revision of airfield lighting systems.
2.2 The construction will be conducted in the sites below:

- Location 1 (07º 30' 34" N 099º 37' 42" E)

- Location 2 (07º 30' 24" N 099º 36' 48" E)

- Location 3 (07º 30' 17" N 099º 36' 49" E)

- Location 4 (07º 29' 56" N 099º 35' 06" E)

- Location 5 (07º 30' 24" N 099º 34' 57" E)

- Location 6 (07º 30' 39" N 099º 36' 36" E)

- Location 7 (07º 30' 33" N 099º 36' 37" E)

- Location 8 (07º 30' 42" N 099º 37' 40" E)

Western area 578 metres away from the threshold of RWY 08

2.3 All workers and equipment must not be over 33 feet above ground level and must vacate runway strip within 15 minutes to accommodate flight operations (take-off and landing).
2.4 The approach lighting at runway 08 will be removed and therefore become unserviceable.
2.5 The construction works will be performed daily from 0100 UTC to 1100 UTC and from 1300 UTC to 2200 UTC except when scheduled flights are operated.
2.6 Flashing red lights (unserviceability light) will be displayed 0.5 metres above ground level at intervals of 3 metres to mark construction site. Vehicles and machinery in the site are all marked by 90 x 90 cn orange and white checkered flags. Personnel in the site are required to wear reflective safety vest to meet safety requirements.
2.7 The chart related to the construction is attached herewith.

3  CONTACTS

3.1 Ms.Sureerat Thipyota

Tel.: +668 9196 6939

E-mail.: [email protected]

3.2 Mr. Uthai Damthip

Tel.: +668 9728 5956

E-mail.: [email protected]

3.3 Ms.Suppamas Phonchanigo

Tel.: +668 4509 6328

E-mail.: [email protected]

3.4 Ms.Kassaporn Ardulyapat

Tel.: +669 7293 1943

E-mail.: [email protected]

4  VALIDITY

This AIRAC AIP Supplement will remain current until 13 October 2026 at 2200 UTC. Any changes to this AIRAC AIP Supplement will be notified through NOTAM.