AIP Supplement for Thailand

AIP SUP

B 24/23

Effective from 23 OCT 2023

to 28 DEC 2023

Published on 19 OCT 2023

  OPENING OF NEW APRON AND TAXIWAY B, EXTENSION OF RUNWAY, TAXIWAY AND APRON,
CONSTRUCTION OF NEW ARFF STATION AND REVISION OF AIRFIELD LIGHTING SYSTEMS
AT BURIRAM AIRPORT (VTUO)

1  INTRODUCTION

This section supplements the following portion(s) of the AIP: AD

1  With effect from 23 October 2023 at 0000 UTC to 28 December 2023 at 1300 UTC, this AIP Supplement is to inform all concerned of opening of a new apron and taxiway B, extension of existing runway, taxiway and apron, construction of a new ARFF Station and revision of airfield lighting systems at Buriram Airport.

2  OPENING OF NEW APRON AND TAXIWAY B

2  A new apron (aircraft stand no. 8 and 9) and taxiway B will be open for service from 23 October 2023 at 0000 UTC to 28 December 2023 at 1300 UTC. The details are shown in the chart in Appendix C.

3  DETAILS OF CONSTRUCTION AND CLOSURE PERIOD

3.1  The construction works will be performed in the areas and time schedule as detailed below:

AreaDetailsPeriodTime (UTC)Remarks
Runway 04/22

Closure of runway 04/22 for surface overlay and runway lighting systems revision

23 Oct 23 -
28 Dec 23

1300 - 2200

except when flights
are operated

Taxiway A

Closure of taxiway A for taxiway extension, taxiway lighting systems revision and taxiway strip reclamation

1 Nov 23 -
28 Dec 23

H24-

Existing Apron (Aircraft Stand No. 3 - 6)

Closure of aircraft stand no. 6 for apron extension

23 Oct 23 -
28 Dec 23

H24

-

Closure of aircraft stand no. 3 - 6 for apron extension

1 Nov 23 -
28 Dec 23

H24See Appendix D
ARFF Station

Construction of new ARFF Station

23 Oct 23 -
28 Dec 23

H24See Appendix B

3.2   Mobile cranes will be operated daily to construct a new ARFF Station at an angle of 60 degrees and a lifting height of 25 metres as detailed in the following table:

Transitional Surface
Location

Distance from
Runway Centreline
(m)

Safety Height

(m)

Remarks

15º13’39.670"N 103º15’14.782"E -

15º13’43.100"N 103º15’17.262"E -

15º13’42.348"N 103º15’18.364"E -

15º13’38.921"N 103º15’15.883"E

1905.72See Appendix B

3.3  Throughout the construction, all vehicles and machinery in the worksites will be equipped with 90 x 90 cm orange and white checkered flags.

3.4  All personnel and vehicles require permission to enter and exit the designated areas.

3.5  All construction equipment will be cleared away before flight operations (take-off and landing).

3.6  The chart related to the construction is attached in Appendix A.

4  AVAILABILITY OF VISUAL AIDS

4   Visual aids will be operated as indicated below:

Visual AidsAvailability
1. Visual aids, markings and lightingsServiceable
2. PAPI and runway lighting systems at runway 04/22
3. Runway threshold identification lights (RTIL) at runway 22
4. Simple approach lighting system (SALS) at runway 04Unserviceable

5  TRAFFIC LIMITATION

5.1  All training flights are not allowed to operate at Buriram Airport throughout the construction period.

5.2  Pilots are required to follow instructions of air traffic controller (ATC).

6  CONTACTS

6.1  Ms. Manita Junpian

Tel: +668 7910 2178

E-mail: jmanita.ae@gmail.com

6.2  Mr. Patomphop Wongtala

Tel: +666 4539 1947

E-mail: Patomphop.w@gmail.com

7  VALIDITY

7  This AIP Supplement supersedes AIRAC AIP Supplement B11/23 and NOTAM C2932/23 and will remain current until 28 December 2023 at 1300 UTC. Any changes to this AIRAC AIP Supplement will be notified through NOTAM.