ContactThe Civil Aviation Authority of Thailand Tel: +662 568 8831 Fax: +662 576 1903 AFS: VTBAYOYX E-mail: [email protected] E-mail: [email protected] | AIP Supplement for Thailand | AIP SUP B 24/23 Effective from 23 OCT 2023 to 28 DEC 2023 Published on 19 OCT 2023 |
This section supplements the following portion(s) of the AIP: AD
1 With effect from 23 October 2023 at 0000 UTC to 28 December 2023 at 1300 UTC, this AIP Supplement is to inform all concerned of opening of a new apron and taxiway B, extension of existing runway, taxiway and apron, construction of a new ARFF Station and revision of airfield lighting systems at Buriram Airport.
2 A new apron (aircraft stand no. 8 and 9) and taxiway B will be open for service from 23 October 2023 at 0000 UTC to 28 December 2023 at 1300 UTC. The details are shown in the chart in Appendix C.
3.1 The construction works will be performed in the areas and time schedule as detailed below:
Area | Details | Period | Time (UTC) | Remarks |
---|---|---|---|---|
Runway 04/22 |
Closure of runway 04/22 for surface overlay and runway lighting systems revision |
23 Oct 23 - | 1300 - 2200 |
except when flights |
Taxiway A |
Closure of taxiway A for taxiway extension, taxiway lighting systems revision and taxiway strip reclamation |
1 Nov 23 - | H24 | - |
Existing Apron (Aircraft Stand No. 3 - 6) |
Closure of aircraft stand no. 6 for apron extension |
23 Oct 23 - | H24 |
- |
Closure of aircraft stand no. 3 - 6 for apron extension |
1 Nov 23 - | H24 | See Appendix D | |
ARFF Station |
Construction of new ARFF Station |
23 Oct 23 - | H24 | See Appendix B |
3.2 Mobile cranes will be operated daily to construct a new ARFF Station at an angle of 60 degrees and a lifting height of 25 metres as detailed in the following table:
Transitional Surface | |||
---|---|---|---|
Location |
Distance from |
Safety Height (m) | Remarks |
15º13’39.670"N 103º15’14.782"E - 15º13’43.100"N 103º15’17.262"E - 15º13’42.348"N 103º15’18.364"E - 15º13’38.921"N 103º15’15.883"E | 190 | 5.72 | See Appendix B |
3.3 Throughout the construction, all vehicles and machinery in the worksites will be equipped with 90 x 90 cm orange and white checkered flags.
3.4 All personnel and vehicles require permission to enter and exit the designated areas.
3.5 All construction equipment will be cleared away before flight operations (take-off and landing).
3.6 The chart related to the construction is attached in Appendix A.
4 Visual aids will be operated as indicated below:
Visual Aids | Availability |
---|---|
1. Visual aids, markings and lightings | Serviceable |
2. PAPI and runway lighting systems at runway 04/22 | |
3. Runway threshold identification lights (RTIL) at runway 22 | |
4. Simple approach lighting system (SALS) at runway 04 | Unserviceable |
5.1 All training flights are not allowed to operate at Buriram Airport throughout the construction period.
5.2 Pilots are required to follow instructions of air traffic controller (ATC).
7 This AIP Supplement supersedes AIRAC AIP Supplement B11/23 and NOTAM C2932/23 and will remain current until 28 December 2023 at 1300 UTC. Any changes to this AIRAC AIP Supplement will be notified through NOTAM.