Contact

The Civil Aviation Authority of Thailand
Aeronautical Information Service Department
333/105 Lak Si Plaza, Khamphaeng Phet 6 Rd.
Talat Bang Khen, Lak Si, Bangkok 10210, Thailand

Tel: +662 568 8831

Fax: +662 576 1903

AFS: VTBAYOYX

E-mail: aisthai@caat.or.th

E-mail: ais@caat.or.th

AIP Supplement for Thailand

AIRAC AIP SUP

B 14/23

Effective from 07 SEP 2023

to 09 JAN 2024

Published on 27 JUL 2023

  INSTALLATION OF AUTOMATED WEATHER OBSERVING SYSTEMS (AWOS)
AT NAKHON SI THAMMARAT AIRPORT (VTSF)

1   INTRODUCTION

This section supplements the following portion(s) of the AIP: AD

1  With effect from 7 September 2023 at 0130 UTC to 9 January 2024 at 2200 UTC, this AIRAC AIP Supplement is to inform all concerned of the installation of automated weather observing systems (AWOS) at Nakhon Si Thammarat Airport (VTSF).

2  INSTALLATION DETAILS

2.1  The AWOS installation will be carried out in airside at runway 01/19 as detailed below:

2.1.1  The AWOS 01 (08° 31' 59.41" N, 099° 56' 35.27" E) and cables (AWOS 01 N/S/E/W) installation will be conducted 22 metres away from the windsock, 330 metres away from the threshold and 100 metres away from the runway centreline.

2.1.2  The new AWOS 19 (08° 32' 46.99" N, 099° 56' 40.15" E) and cables (AWOS 19 N/S/E/W) installation will be conducted 4 metres away from the existing AWOS 19 (using the location of the original transmissometer as the referent point), 300 metres away from the threshold and 108 metres away from the runway centreline.

2.2  The installation works will be performed daily between 0130 - 1000 UTC and 1500 - 2200 UTC except when scheduled flights are operated.

2.3  Safety plan during installation period

2.3.1  All vehicles and machinery in worksite will be equipped with 90 x 90 cm orange and white checkered flags or flashing yellow lights.

2.3.2  The installation locations will be demarcated by highly visible barriers painted in alternate bands of red and white or orange and white.

2.3.3  Personnel in worksite are required to wear a reflective safety vest to meet safety requirements.

2.3.4  For more information, please refer to Nakhon Si Thammarat Airport's Construction Safety Plan and Measures.

2.4  The charts related to the installation project are attached herewith.

3  CONTACTS

3.1  Mr. Thongin Choosai

Tel : +669 3495 1866

3.2  Mr. Tossapon Choosai

Tel : +668 1646 0362

E-mail: tossapon89@gmail.com

3.3  Mr. Pholkrit Tongsaner

Tel : +669 8282 4416

E-mail: Pholkrit2508@gmail.com

4  VALIDITY

4  This AIRAC AIP Supplement will remain current until 9 January 2024 at 2200 UTC. Any change to this AIRAC AIP Supplement will be notified through NOTAM.