ContactThe Civil Aviation Authority of Thailand Tel: +662 568 8831 Fax: +662 576 1903 AFS: VTBAYOYX E-mail: [email protected] E-mail: [email protected] | AIP Supplement for Thailand | AIP SUP A 22/21 Effective from 03 NOV 2021 to 03 MAR 2022 Published on 21 OCT 2021 |
This section supplements the following portion(s) of the AIP: AD
1 With effect from 3 November 2021 at 1700 UTC until 23 February 2022 at 1659 UTC, the purpose of this AIP Supplement is to inform all concerned of the surface maintenance of Runway 03L/21R at Don Mueang International Airport.
Construction Area | Period (UTC) |
---|---|
RWY 03L/21R | 3 November 2021 at 1700 UTC until 23 February 2022 at 1659 UTC (H24) |
2 Construction area lay-out are shown in Appendix.
3.1 Runway 03L/21R is not allowed for landing and take-off.
3.2 Closed Taxiway E, F, J, O, R and C SOUTH refer to taxiways that have connected to Runway 03L/21R except Taxiway D and S.
4.1 During the construction period, PAPI, approach lighting systems and runway lighting system on the construction area are unserviceable.
4.2 Instrument landing system (ILS) of Runway 03L/21R are unserviceable.
5.1 The construction areas will be demarcated by frangible barriers. The frangible barriers will be painted in alternate bands of red and white or orange, minimum 0.5 metre high and will be lighted at night and during low visibility condition by omni-directional fixed red lights.
5.2 Closure marking are displayed on a closed portion of runway (white crosses) and taxiways (yellow crosses).
5.3 Taxiway Edge Lights, Taxiway Centre line Lights and signage leading to Runway 03L/21R are unserviceable.
6.1 During the period of the maintenance work process, aircraft should strictly follow ATC instruction to avoid any dangerous circumstances.
6.2 All vehicles and machineries are marked by 90 x 90 cm, red and white checkered flag. Also flashing yellow light shall be installed at the highest point of the vehicles.
7 For further information contact via the following:
Unit: Aeronautical Information Service Sub-Division of Don Mueang International Airport
Tel: +662 535 1793 or +662 535 1782
E-mail: [email protected]
8 This AIP Supplement will remain current until 23 February 2022 at 1659 UTC. Any changes to this AIP Supplement will be notified through NOTAM.