ContactAeronautical Information Management Department Tel: +662 568 8831 Fax: +662 576 1903 AFS: VTBAYOYX E-mail: aisthai@caat.or.th E-mail: ais@caat.or.th | AIP Supplement for Thailand | AIRAC AIP SUP B 14/24 Effective from 08 AUG 2024 to 31 DEC 2024 Published on 27 JUN 2024 |
This section supplements the following portion(s) of the AIP: AD
1 With effect from 8 August 2024 at 0100 UTC to 31 December 2024 at 1000 UTC, this AIRAC AIP Supplement is to inform all concerned of Runway 05/23 turn pad lights installation at Ubon Ratchathani Airport.
2.1 The installation project includes installation of Runway 05/23 turn pad lights, pavement boring and saw cutting, installation of cables in pavement sawcut and electrical conduit, and installation of CCR controlling and monitoring system.
2.2 The installation works will be carried out at runway, taxiway, apron, ATC Tower and AFL Building.
2.3 The installation works will be performed daily between 0100 - 1000 UTC except when flights are operated.
2.4 All vehicles and machinery in the worksites will be equipped with 90 x 90 cm orange and white checkered flags or flashing yellow lights. The worksites will be denoted by highly visible barriers painted in alternate bands of red and white or orange and white. All personnel in the worksites are required to wear a reflective safety vest to meet safety requirements.
2.5 The chart related to the installation project is attached herewith.
3.1 Miss Waranrat Kaewsoprom
Tel: +666 2916 6954
E-mail: waranrat01@gmail.com
3.2 Mr. Jittiporn Loarach
Tel: +668 2784 2781
E-mail: tent.sven@gmail.com
4 This AIRAC AIP Supplement will remain current until 31 December 2024 at 1000 UTC. Any changes to this AIRAC AIP Supplement will be notified through NOTAM.