Contact

The Civil Aviation Authority of Thailand
Aeronautical Information Service Department
333/105 Lak Si Plaza, Khamphaeng Phet 6 Rd.
Talat Bang Khen, Lak Si, Bangkok 10210, Thailand

Tel: +662 568 8831

Fax: +662 576 1903

AFS: VTBAYOYX

E-mail: aisthai@caat.or.th

E-mail: ais@caat.or.th

AIP Supplement for Thailand

AIP SUP

B 09/21

Effective from 22 OCT 2021

to 13 DEC 2022

Published on 21 OCT 2021

  REVISED THE CONSTRUCTION OF RUNWAY WIDTH EXTENSION, OVERLAY OF RUNWAY 18/36 AND AIRFIELD LIGHTING SYSTEM AT LAMPANG AIRPORT

1  INTRODUCTION

This section supplements the following portion(s) of the AIP: AD

1  With effect from 22 October 2021 at 1230 UTC to 13 December 2022 at 2300 UTC, this AIP Supplement is to inform all concerned of the construction of runway width extension, overlay of Runway 18/36 and airfield lighting system at Lampang Airport.

2  CONSTRUCTION AREAS AND PERIOD

2.1  The construction includes runway width extension of Runway 18/36 from 30 metres to 45 metres, overlay of the Runway 18/36 and airfield lighting system.

2.2  The construction works will be performed daily from 22 October 2021 at 1230 UTC to 13 December 2022 at 2300 UTC except when flights are operated.

2.3  During the construction period, Runway 18/36 will be closed from 1230 UTC to 2300 UTC and will be opened for operation from 0030UTC onwards.

2.4  Throughout the construction, vehicles and machinery in the site are all equipped by 90 x 90 cm "orange and white" or "red and white" checkered flags, flashing yellow lights, reflective tapes and fire extinguishers.

2.5  The height of all machinery and vehicles are not exceed 4 metres.

2.6  Contractor will be clearing the construction side and related field before 0030 UTC to prevent FOD.

2.7  All personnel and vehicles are able to enter and exit at the designated area only. Access to other areas must be permitted by airport officials.

2.8  During the construction period, pilots shall be advised by air traffic controller (ATC) to operate flights with caution.

2.9  During the construction period. Airport operators will inform of declared emergency at least 30 minutes.

2.10  The charts related to the construction are attached herewith.

3  CONTACT

3.1  Mr. Supachai Arayamonkhong

Tel: +668 5706 2335

E-mail: supceo2012@gmail.com

3.2  Mr. Phongnaphat Aunthapunya

Tel: +668 8291 9206

E-mail: phongnaphat.a@airports.go.th

3.3  Mr. Jakkrapong Khummarbut

Tel: +668 8251 6824

E-mail: jakkrapong.k@airports.go.th

4  VALIDITY

4  This AIP Supplement superseded AIRAC AIP Supplement B03/21, NOTAM C2925/21, C2926/21 and will remain current until 13 December 2022 at 2300 UTC. Any changes to this AIP Supplement will be notified through NOTAM.