AIPAMDTSUPsAICs

Published as of 01 JUL 2021

-Series: A
7/01 ESTABLISHMENT OF STANDARD INSTRUMENT DEPARTURE (SIDs) AT TRANG AIRPORT
4/11 IMPLEMENTATION OF RNP 10 OPERATIONS (50 NM LONGITUDINAL SEPARATION) ON ROUTE SEGMENTS JOINING ATS ROUTE P762 WITHIN BANGKOK FIR
7/11 IMPLEMENTATION OF PRE-DEPARTURE CLEARANCE (PDC) OVER DATA LINK
16/11 IMPLEMENTATION OF RNP 10 OPERATIONS ON ATS ROUTES WITHIN BANGKOK FIR
14/14 ESTABLISHMENT OF THE TEMPORARY ENGINE RUN-UP AREA, THE TEMPORARY ISOLATED AIRCRAFT PARKING AREAS AND THE TEMPORARY HELICOPTER LANDING AREA AT SUVARNABHUMI AIRPORT
24/16 Deferred Implementation of ICAO’s Amendment 7A to the 15th Edition of Procedure for AirNavigation Services- Air Traffic Management (PANS-ATM, Doc 4444) in Thailand
31/16 OPERATING PROCEDURES FOR RNP10 OPERATIONS ON ATS ROUTES L507, P646, N895, L524 AND L301
10/17 TYPE OF AIRCRAFT CAN BE PARKED AT PIER 5 DON MUEANG INTERNATIONAL AIRPORT
21/17 MODES OF OPERATION FOR SUVARNABHUMI INTERNATIONAL AIRPORT
33/17 IMPLEMENTATION OF UNI-DIRECTIONAL OPERATING PROCEDURES FOR FLIGHTS OPERATING ON ATS ROUTE R468 AND A340
40/17 REVISED CLOSURE OF TAXIWAY C AND D AT PHUKET INTERNATIONAL AIRPORT
11/18 IMPLEMENTATION OF OPERATING PROCEDURES AND ESTABLISHMENT OF STANDARD DEPARTURE CHART – INSTRUMENT (SID) OF RAYONG / U-TAPAO RAYONG PATTAYA INTERNATIONAL AIRPORT
21/20 AIRSPACE MANAGEMENT AND OPERATING PROCEDURES FOR AIRSPACE MANAGEMENT CELL (THAILAND)
26/20 TEMPORARY TOWER CRANES AT NEARBY CHIANG MAI INTERNATIONAL AIRPORT
27/20 IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM)AT DON MUEANG INTERNATIONAL AIRPORT
28/20 IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) AT SUVARNABHUMI INTERNATIONAL AIRPORT
29/20 PHUKET INTERNATIONAL AIRPORT RUNWAY MAINTENANCE PROGRAM
31/20 ESTABLISHMENT OF NEW TAXIWAYS AND TAXILANES FOR TEMPORARY AIRCRAFT PARKING AT SUVARNABHUMI INTERNATIONAL AIRPORT
01/21 THE UPPER-AIR SOUNDING IN BANGKOK FIR 2021
02/21 THE UPPER-AIR BALLOON OBSERVATION IN BANGKOK FIR 2021
06/21 TEMPORARY TOWER CRANES AT NEARBY DON MUEANG INTERNATIONAL AIRPORT
07/21 TEMPORARY FENCES INSTALLED FOR CONSTRUCTION AREA AND THE REDUCTION OF RUNWAY STRIP 01L/19R DIMENSION AT SUVARNABHUMI INTERNATIONAL AIRPORT
08/21 TEMPORARY WITHDRAWAL OF PATTANI (PT) NDB
09/21 REVISED AERIAL LASER TOPOGRAPHY SURVEY BY ROYAL THAI SURVEY DEPARTMENT
10/21 THE CONSTRUCTION OF NEW TAXIWAYS AT MAE FAH LUANG-CHIANG RAI INTERNATIONAL AIRPORT
12/21 THE CLOSURE OF SSR RADAR PHUKET STATION
-Series: B
8/00 ESTABLISHMENT OF NEW INSTRUMENT APPROACH PROCEDURES AT PHRAE AIRPORT
10/00 ESTABLISHMENT OF INSTRUMENT APPROACH PROCEDURE AT TAK/TAK AIRPORT
15/09 CANCELLATION OF THE OCA/H AIRCRAFT CATEGORY C AND D ON INSTRUMENT APPROAGH CHART IN MAE HONG SON AIRPORT CONTAINED IN AIP THAILAND
2/17 RE-ACTIVATE STANDARD INSTRUMENT DEPARTURE RUNWAY 20 OF RANONG AIRPORT
14/20 THE CONSTRUCTION OF NEW TERMINAL AT NAKHON SI THAMMARAT AIRPORT
16/20 THE CONSTRUCTION OF RUNWAY WIDTH EXTENSION, OVERLAY OF RUNWAY 16/34, TAXIWAYS PAVEMENT AND REVISION OF RELEVANT LIGHTING SYSTEM AT HUA HIN AIRPORT
02/21 THE OVERLAY OF RUNWAY 18/36 AND TAXIWAYS PAVEMENT, REVISION OF RELEVANT LIGHTING SYSTEM AND CONSTRUCTION OF RUNWAY 18/36 TURN PAD AT PHETCHABUN AIRPORT
03/21 THE CONSTRUCTION OF RUNWAY WIDTH EXTENSION, OVERLAY OF RUNWAY 18/36 AND AIRFIELD LIGHTING SYSTEM AT LAMPANG AIRPORT
04/21 TEMPORARY WITHDRAWAL OF SUKHOTHAI DME (CH40X) AT SUKHOTHAI AIRPORT
05/21 TEMPORARY WITHDRAWAL OF NAN/NAN NAKHON ILS/DME AT NAN NAKHON AIRPORT
06/21 THE OVERLAY OF RUNWAY 08/26 PAVEMENT, CONSTRUCTION OF NEW TAXIWAYS AND NEW APRON, AND REVISION OF RELEVANT LIGHTING SYSTEMS AT TRANG AIRPORT