  THE OVERLAY OF RUNWAY 08/26 PAVEMENT, CONSTRUCTION OF NEW TAXIWAYS AND NEW APRON, AND REVISION OF RELEVANT LIGHTING SYSTEMS AT TRANG AIRPORT

  INTRODUCTION

This section supplements the following portion(s) of the AIP: AD

  with effect from 18 December 2020 at 0100 UTC to 30 June 2021 at 2200 UTC, this AIP Supplement is to inform all concerned of the overlay of runway 08/26 pavement, construction of new taxiways and new apron and revision of relevant lighting systems at Trang Airport. The details are as follows:

  CONSTRUCTION AREAS AND PERIOD

  Runway, new taxiways and new apron

The construction works are overlaying the runway 08/26 pavement and building new taxiways (D, E and F) and a new apron.

  Lighting systems

The construct works include revision of the lighting systems at runway 08/26 and the other relevant lighting systems.

  The construction works will be performed daily from 0100 - 1300 UTC and 1330 - 2200 UTC besides the time period being reserved for scheduled flights.

  Throughout the construction vehicles and machinery in the site are all marked by 90 x 90 cm. orange and white checkered flags and equipped with obstruction lights.

  The height of all machinery and vehicles must not exceed 4 metres.

  The only designated entrance/exit way of all personnel and vehicles as shown in the operation chart.

  Due to the ongoing construction, pilots are advised caution during flight operation (take-off and landing).

  If there is aircraft accident, all personnel, vehicles and equipment must be moved out as directed by air traffic controller and the emergency plan must be followed promptly.

  Airport operator will be informed of declared emergency 30 minutes before conducting construction works.

  The charts related to the construction of airside management system are attached herewith.

  CONTACTS

  Mrs. Jutarat Petch-Lu

  Mr. Uthai Damthip

  Mr. Teera Sangkamolee

  Mr. Sopon Boonchongcoo

  Mr. Thongchai Chuchoet

  VALIDITY

  This AIP Supplement superseded NOTAM C3703/20 and will remain current until 30 June 2021 at 2200 UTC. Any change to this AIP Supplement will be notified through NOTAM.